Three Unit Shed Build In Buckinghamshire
drage’s largest project to date. Over 645,000 sq ft across three units of a base build electrical installation.
Completed over 40 weeks with works ongoing on multiple units at the same time, this was a project that we can be proud of the end result.
![](https://drageelectrics.com/wp-content/uploads/2023/08/AC2.png)
![](https://drageelectrics.com/wp-content/uploads/2023/08/AC4.png)
![](https://drageelectrics.com/wp-content/uploads/2023/08/Aston-Clinton-Unit-3-20200321tritax133-scaled-1-1024x512.jpg)
Our works included:
LV distribution
Primary and secondary cable management systems
Lighting, emergency lighting and smart controls
External lighting
Electric Vehicle Charging
Small power
Testing and commissioning
Case studies